Our Work

bulkhead before job performed

Bulkhead Before

bulkhead after job was completed

Bulkhead After

storm damaged pier

Storm Damaged Pier

No repair is too big or small. We’ll remove your damaged pier, dock, bulkhead, and/or catwalk, and replace it with sturdy new construction to fit your style and needs.

back filling new bulkhead with catwalk

Back Filling Bulkhead

After new bulkheads are installed, they are back-filled to ensure stability of the new bulkhead and to prevent erosion.

sheet driving for bulkhead

Sheet Driving

Sheets are driven into the ground, giving overall structural stability for a newly constructed bulkhead.

dock builder building rock revetment

Rock Revetment

Large native rocks are strategically placed to prevent erosion.

dock builder showing sea grass plantings

Sea Grass Plantings

Sea grasses native to the area are planted as a method of environmental restoration; this also prevents beach erosion.

dock builder made gabion baskets

Gabion Baskets

Another method of rock revetment, is the installation of gabion baskets, which are filled with quarry stone, as a method for extreme weather erosion prevention.


Environment is Essential to Long Island Life

Reeves Creek Marine Construction Dock Builder Logo
Address

5117 Sound Ave
Riverhead NY 11901
1-631-722-3383

Hours

Monday - Friday
8am - 4pm
Emergency Service
24 Hours